View: Projects

RotoID: PM0022
Tables: PMPROJS, PMPROJT
Protocol: Detail, Sequenced revisions, Key auto generate
DLL: PMPROJS

Compositions: 5

RotoID  Tables  Title  DLL 

PM0021  PMCONTSPMCONTT  Contracts  PMCONTS
PM0039  PMCATGT  Contract Categories  PMCATGT
PM0120  PMRES  Contract Resources  PMRES
PM0121  PMRESC  Contract Resource Categories  PMRESC
PM0851  PMPROJSO  Project Optional Field  PMPROJSO

Keys: 4

Title  Fields

Contract Uniquifier/Line Number  CTUNIQ, PLINENUM
Contract Uniquifier/Detail Numbe  CTUNIQ, DETAILNUM
Contract/Project  CONTRACT, PROJECT
Customer/Contract/Project  CUSTOMER, CONTRACT, PROJECT

Fields: 412

Field  Index  Type  Title  Attributes  Presentation

CTUNIQ  BCD*10.0  Contract Uniq  E A K R   
PLINENUM  Long  Line Number  E A K R   
CONTRACT  String*16  Contract  E A  Mask: %-16C
PROJECT  String*16  Project  E A  Mask: %-16N
DETAILNUM  Long  Detail Number  E A   
DATELASTMN  Date  Last Maintained  A C   
STARTDATE  Date  Projected Start Date  E A X   
ORJENDDATE  Date  Projected End Date  E A X   
CURENDDATE  Date  Current End Date  A X   
CLOSEDDATE  10  Date  Date Closed  A   
DESC  11  String*60  Description  E A   
PROJTYPE  12  Integer  Project Type  A X  List: 3 entries
1=Time and Materials
2=Fixed Price
3=Cost Plus
REVREC  13  Integer  Accounting Method  A P X  List: 7 entries
1=Completed Project
2=Total Cost Percentage Complete
3=Labor Hours Percentage Complete
4=Billings and Costs
5=Project Percentage Complete
6=Category Percentage Complete
8=Accrual-Basis
COSTPLUSP  14  BCD*5.5  Cost Plus Percentage  A X   
CLOSEBILL  15  Integer  Closed to Billings  E A X  List: 2 entries
1=Yes
0=No
CLOSECOST  16  Integer  Closed to Costs  E A  List: 2 entries
1=Yes
0=No
PROJSTAT  17  Integer  Project Status  E A X  List: 7 entries
10=Estimate
20=Approved
30=Open
40=On Hold
70=Inactive
60=Completed
50=Closed
USEDEFREV  18  Integer  Revenue Type  E A  List: 2 entries
0=Revenue
1=Deferred Revenue
BILLTYPE  19  Integer  Billing Type  E A X  List: 3 entries
2=Billable
3=No Charge
1=Non-billable
PERRETREC  20  BCD*5.5  A/R Retainage Percentage  E A   
RETRECD  21  Integer  A/R Retention Period  E A   
BILLACCT  22  String*45  Billings  E A X  Mask: %-45C
DEFRACCT  23  String*45  Deferred Revenue  A  Mask: %-45C
REVACCT  24  String*45  Revenue  E A X  Mask: %-45C
PROFITACCT  25  String*45  Profit  A  Mask: %-45C
LOSSACCT  26  String*45  Loss  A  Mask: %-45C
GAINACCT  27  String*45  Gain  A  Mask: %-45C
WIPACCT  28  String*45  Work in Progress  A X  Mask: %-45C
COGSACCT  29  String*45  Cost of Sales  A X  Mask: %-45C
PONUMBER  30  String*22  P/O Number  E A  Mask: %-22C
FORMCODE  31  String*6  Form Code  E A  Mask: %-6N
INVTYPE  32  Integer  A/R Invoice Type  A X  List: 2 entries
1=Item
2=Summary
ORATE  33  BCD*8.7  Original Exchange Rate  A   
ORATETYPE  34  String*2  Original Rate Type  A  Mask: %-2N
ORATEDATE  35  Date  Original Rate Date  A   
RATE  36  BCD*8.7  Exchange Rate  E A   
RATETYPE  37  String*2  Rate Type  E A  Mask: %-2N
RATEOP  38  Integer  Rate Operator  E A  List: 2 entries
1=Multiply
2=Divide
RATEDATE  39  Date  Rate Date  E A   
RATESPREAD  40  BCD*8.7  Rate Spread  E A   
ESTBILLCCY  41  Integer  Revenue And Cost Currency  E A  List: 3 entries
1=Revenue and Costs in Functional Currency
2=Revenue in Customer Currency
3=Revenue and Costs in Customer Currency
COSTCCY  42  String*3  Cost Currency  E A  Mask: %-3N
REVCCY  43  String*3  Revenue Currency  E A  Mask: %-3N
INVSTATE  44  Integer  Invoice Status  E A  List: 3 entries
1=Not Processed
2=On Worksheet
3=On Invoice
NUMCATS  45  Long  Number of Categories  E A   
ORJTIMECSR  46  BCD*10.3  Reserved  A   
ORJTIMECHM  47  BCD*10.3  Orig. Labor Cost Est.  A   
CURTIMECSR  48  BCD*10.3  Reserved  A   
CURTIMECHM  49  BCD*10.3  Cur. Labor Cost Est.  A   
ACTTIMECSR  50  BCD*10.3  Reserved  A   
ACTTIMECHM  51  BCD*10.3  Actual Labor Costs  A   
RECTIMECSR  52  BCD*10.3  Reserved  A   
RECTIMECHM  53  BCD*10.3  Reserved  A   
ORJTIMEBSR  56  BCD*10.3  Orig. Labor Billing Est.  A   
ORJTIMEBHM  57  BCD*10.3  Orig. Labor Billing Est.  A   
CURTIMEBSR  58  BCD*10.3  Cur. Labor Billing Est.  A   
CURTIMEBHM  59  BCD*10.3  Cur. Labor Billing Est.  A   
ACTTIMEBSR  60  BCD*10.3  Actual Labor Billings  A   
ACTTIMEBHM  61  BCD*10.3  Actual Labor Billings  A   
RECTIMEBSR  62  BCD*10.3  Reserved  A   
RECTIMEBHM  63  BCD*10.3  Reserved  A   
ORJTIMEQTY  66  BCD*10.5  Orig. Labor Qty Est.  A   
CURTIMEQTY  67  BCD*10.5  Cur. Labor Qty Est.  A   
ACTTIMEQTY  68  BCD*10.5  Actual Labor Qty  A   
PERTIMEQTY  69  BCD*5.5  Labor Percentage Complete  A   
ORJMATECSR  70  BCD*10.3  Reserved  A   
ORJMATECHM  71  BCD*10.3  Orig. Material Estimated Cost  A   
CURMATECSR  72  BCD*10.3  Reserved  A   
CURMATECHM  73  BCD*10.3  Current Material Estimated Cost  A   
ACTMATECSR  74  BCD*10.3  Reserved  A   
ACTMATECHM  75  BCD*10.3  Actual Material Cost  A   
RECMATECSR  76  BCD*10.3  Reserved  A   
RECMATECHM  77  BCD*10.3  Reserved  A   
ORJMATEBSR  80  BCD*10.3  Orig. Material Billing Est.  A   
ORJMATEBHM  81  BCD*10.3  Orig. Material Billing Est.  A   
CURMATEBSR  82  BCD*10.3  Cur. Material Billing Est.  A   
CURMATEBHM  83  BCD*10.3  Cur. Material Billing Est.  A   
ACTMATEBSR  84  BCD*10.3  Actual Material Billed  A   
ACTMATEBHM  85  BCD*10.3  Actual Material Billed  A   
RECMATEBSR  86  BCD*10.3  Reserved  A   
RECMATEBHM  87  BCD*10.3  Reserved  A   
ORJMATEQTY  90  BCD*10.5  Orig. Material Qty Est.  A   
CURMATEQTY  91  BCD*10.5  Cur. Material Est.  A   
ACTMATEQTY  92  BCD*10.5  Actual Material Qty  A   
ORJEQUICSR  94  BCD*10.3  Reserved  A   
ORJEQUICHM  95  BCD*10.3  Orig. Estimated Equipment Cost  A   
CUREQUICSR  96  BCD*10.3  Reserved  A   
CUREQUICHM  97  BCD*10.3  Cur. Estimated Equipment Cost  A   
ACTEQUICSR  98  BCD*10.3  Reserved  A   
ACTEQUICHM  99  BCD*10.3  Actual Equipment Cost  A   
RECEQUICSR  100  BCD*10.3  Reserved  A   
RECEQUICHM  101  BCD*10.3  Reserved  A   
ORJEQUIBSR  104  BCD*10.3  Orig. Equipment Billing Est.  A   
ORJEQUIBHM  105  BCD*10.3  Orig. Equipment Billing Est.  A   
CUREQUIBSR  106  BCD*10.3  Cur. Equipment Billing Est.  A   
CUREQUIBHM  107  BCD*10.3  Cur. Equipment Billing Est.  A   
ACTEQUIBSR  108  BCD*10.3  Actual Equipment Amount Billed  A   
ACTEQUIBHM  109  BCD*10.3  Actual Equipment Amount Billed  A   
RECEQUIBSR  110  BCD*10.3  Reserved  A   
RECEQUIBHM  111  BCD*10.3  Reserved  A   
ORJEQUIQTY  114  BCD*10.5  Orig. Equipment Qty Est.  A   
CUREQUIQTY  115  BCD*10.5  Cur. Equipment Est.  A   
ACTEQUIQTY  116  BCD*10.5  Actual Equipment Qty  A   
ORJSUBCCSR  118  BCD*10.3  Reserved  A   
ORJSUBCCHM  119  BCD*10.3  Orig. Subcontractor Est. Cost  A   
CURSUBCCSR  120  BCD*10.3  Reserved  A   
CURSUBCCHM  121  BCD*10.3  Cur. Subcontractor Est. Cost  A   
ACTSUBCCSR  122  BCD*10.3  Reserved  A   
ACTSUBCCHM  123  BCD*10.3  Actual Subcontractor Cost  A   
RECSUBCCSR  124  BCD*10.3  Reserved  A   
RECSUBCCHM  125  BCD*10.3  Reserved  A   
ORJSUBCBSR  128  BCD*10.3  Orig. Subcontract Billing Est.  A   
ORJSUBCBHM  129  BCD*10.3  Orig. Subcontract Billing Est.  A   
CURSUBCBSR  130  BCD*10.3  Cur. Subcontract Billing Est.  A   
CURSUBCBHM  131  BCD*10.3  Cur. Subcontract Billing Est.  A   
ACTSUBCBSR  132  BCD*10.3  Actual Subcontract Amt Billed  A   
ACTSUBCBHM  133  BCD*10.3  Actual Subcontract Amt Billed  A   
RECSUBCBSR  134  BCD*10.3  Reserved  A   
RECSUBCBHM  135  BCD*10.3  Reserved  A   
ORJSUBCQTY  138  BCD*10.5  Orig. Subcontractor Qty Est.  A   
CURSUBCQTY  139  BCD*10.5  Cur. Subcontractor Est.  A   
ACTSUBCQTY  140  BCD*10.5  Actual Subcontractor Qty  A   
ORJOHEXCSR  142  BCD*10.3  Reserved  A   
ORJOHEXCHM  143  BCD*10.3  Orig. Est Overhead Expense Cost  A   
CUROHEXCSR  144  BCD*10.3  Reserved  A   
CUROHEXCHM  145  BCD*10.3  Cur. Est. Overhead Expense Cost  A   
ACTOHEXCSR  146  BCD*10.3  Reserved  A   
ACTOHEXCHM  147  BCD*10.3  Actual Overhead Expense Cost  A   
RECOHEXCSR  148  BCD*10.3  Reserved  A   
RECOHEXCHM  149  BCD*10.3  Reserved  A   
ORJOHEXBSR  152  BCD*10.3  Orig. Overhead Billing Est.  A   
ORJOHEXBHM  153  BCD*10.3  Orig. Overhead Billing Est.  A   
CUROHEXBSR  154  BCD*10.3  Cur. Overhead Billing Est.  A   
CUROHEXBHM  155  BCD*10.3  Cur. Overhead Billing Est.  A   
ACTOHEXBSR  156  BCD*10.3  Actual Overhead Amount Billed  A   
ACTOHEXBHM  157  BCD*10.3  Actual Overhead Billing Est.  A   
RECOHEXBSR  158  BCD*10.3  Reserved  A   
RECOHEXBHM  159  BCD*10.3  Reserved  A   
ORJOHEXQTY  162  BCD*10.5  Orig. Overhead Qty Est.  A   
CUROHEXQTY  163  BCD*10.5  Cur. Overhead Est.  A   
ACTOHEXQTY  164  BCD*10.5  Actual Overhead Qty  A   
ORJMISCCSR  166  BCD*10.3  Reserved  A   
ORJMISCCHM  167  BCD*10.3  Orig. Est. Miscellaneous Cost  A   
CURMISCCSR  168  BCD*10.3  Reserved  A   
CURMISCCHM  169  BCD*10.3  Cur. Est. Miscellaneous Cost  A   
ACTMISCCSR  170  BCD*10.3  Reserved  A   
ACTMISCCHM  171  BCD*10.3  Actual Miscellaneous Cost  A   
RECMISCCSR  172  BCD*10.3  Reserved  A   
RECMISCCHM  173  BCD*10.3  Reserved  A   
ORJMISCBSR  176  BCD*10.3  Orig. Miscellaneous Billing Est  A   
ORJMISCBHM  177  BCD*10.3  Orig. Miscellaneous Billing Est  A   
CURMISCBSR  178  BCD*10.3  Cur. Miscellaneous Billing Est.  A   
CURMISCBHM  179  BCD*10.3  Cur. Miscellaneous Billing Est.  A   
ACTMISCBSR  180  BCD*10.3  Actual Miscellaneous Amt Billed  A   
ACTMISCBHM  181  BCD*10.3  Actual Miscellaneous Amt Billed  A   
RECMISCBSR  182  BCD*10.3  Reserved  A   
RECMISCBHM  183  BCD*10.3  Reserved  A   
ORJMISCQTY  186  BCD*10.5  Orig. Miscellaneous Qty Est.  A   
CURMISCQTY  187  BCD*10.5  Cur. Miscellaneous Qty Est.  A   
ACTMISCQTY  188  BCD*10.5  Actual Miscellaneous Qty  A   
CUSTOMER  416  String*12  Customer  E A X  Mask: %-12C
ORJOHEADSR  190  BCD*10.3  Reserved  A   
ORJOHEADHM  191  BCD*10.3  Original Overhead Estimate  A   
CUROHEADSR  192  BCD*10.3  Reserved  A   
CUROHEADHM  193  BCD*10.3  Current Overhead Estimate  A   
ACTOHEADSR  194  BCD*10.3  Reserved  A   
ACTOHEADHM  195  BCD*10.3  Actual Overhead  A   
ORJLABSR  199  BCD*10.3  Reserved  A   
ORJLABHM  200  BCD*10.3  Original Labor Amount Estimate  A   
CURLABSR  201  BCD*10.3  Reserved  A   
CURLABHM  202  BCD*10.3  Current Labor Amount Estimate  A   
ACTLABSR  203  BCD*10.3  Reserved  A   
ACTLABHM  204  BCD*10.3  Actual Labor Amount  A   
ORJCHRGSR  208  BCD*10.3  Reserved  A   
ORJCHRGHM  209  BCD*10.3  Reserved  A   
CURCHRGSR  210  BCD*10.3  Reserved  A   
CURCHRGHM  211  BCD*10.3  Reserved  A   
ACTCHRGSR  212  BCD*10.3  Actual Charge Amount  A   
ACTCHRGHM  213  BCD*10.3  Actual Charge Amount  A   
ACTCHRGDSR  214  BCD*10.3  Act Chrg Amt Billed & Deferred  A   
ACTCHRGDHM  215  BCD*10.3  Act Chrg Amt Billed & Deferred  A   
RECCHRGSR  216  BCD*10.3  Reserved  A   
RECCHRGHM  217  BCD*10.3  Reserved  A   
ACTSTKRESR  220  BCD*10.3  Reserved  A   
ACTSTKREHM  221  BCD*10.3  Act Cost Stock Ret to Inventory  A   
ACTSTKRQTY  222  BCD*10.5  Act Qty Stock Ret to Inventory  A   
TARRECTSSR  223  BCD*10.3  Total A/R Customer Receipts  A   
TARRECTSHM  224  BCD*10.3  Total A/R Customer Receipts  A   
TAPPAYMTS  225  BCD*10.3  Total A/P Vendor Payments  A   
TORJCOSTSR  226  BCD*10.3  Reserved  A   
TORJCOSTHM  227  BCD*10.3  Total Orig. Cost Est.  A   
TCURCOSTSR  228  BCD*10.3  Reserved  A   
TCURCOSTHM  229  BCD*10.3  Total Cur. Cost Est.  A   
TACTCOSTSR  230  BCD*10.3  Reserved  A   
TACTCOSTHM  231  BCD*10.3  Total Actual Cost  A   
TRECCOSTSR  232  BCD*10.3  Reserved  A   
TRECCOSTHM  233  BCD*10.3  Total Cost Recognized  A   
PERTCOST  234  BCD*5.5  Percent Total Cost  A   
PERTREV  235  BCD*5.5  Percent Total Revenue  E A   
TORJREVSR  236  BCD*10.3  Total Orig. Revenue Est.  A   
TORJREVHM  237  BCD*10.3  Total Orig. Revenue Est.  A   
TCURREVSR  238  BCD*10.3  Total Cur. Revenue Est.  A   
TCURREVHM  239  BCD*10.3  Total Cur. Revenue Est.  A   
TACTREVSR  240  BCD*10.3  Total Actual Revenue  A   
TACTREVHM  241  BCD*10.3  Total Actual Revenue  A   
TRECREVSR  242  BCD*10.3  Total Revenue Recognized  A   
TRECREVHM  243  BCD*10.3  Total Revenue Recognized  A   
RETARAMTSR  246  BCD*10.3  Retainage Receivable  A   
RETARAMTHM  247  BCD*10.3  Retainage Receivable  A   
RETARRECSR  248  BCD*10.3  Retainage Amount Received in A/R  A   
RETARRECHM  249  BCD*10.3  Retainage Amount Received in A/R  A   
RETAPAMT  250  BCD*10.3  Retainage Payable  A   
RETAPPAID  251  BCD*10.3  Retainage Amount Paid in A/P  A   
POAMOUNTSR  252  BCD*10.3  Reserved  A   
POAMOUNTHM  253  BCD*10.3  Reserved  A   
POQTY  254  BCD*10.5  Committed P/O Quantity  A C   
OEAMOUNTSR  255  BCD*10.3  Reserved  A   
OEAMOUNTHM  256  BCD*10.3  Recognized Loss  A   
OEQTY  257  BCD*10.5  Reserved  A   
PCOMPLETEB  260  BCD*5.5  Billings Percent Complete  A   
PCOMPLETER  262  BCD*5.5  RR Percent Complete  A   
FPAMOUNTSR  263  BCD*10.3  Fixed Price Amount  A X   
FPAMOUNTHM  264  BCD*10.3  Fixed Price Amount  A   
LSTBILLPER  265  BCD*5.5  Last Billings Percent Complete  A   
BILLAMTRSR  266  BCD*10.3  Recognized Amount to Bill  E A   
BILLAMTRHM  267  BCD*10.3  Recognized Amount to Bill  E A   
COSTDATE  268  Date  Last Cost Posting Date  A   
BILLDATE  269  Date  Last Billings Posting Date  A   
OHDATE  270  Date  Last Overhead Posting Date  A   
CHARGEDATE  271  Date  Last Charge Posting Date  A   
REVRECDATE  272  Date  Last Revenue Rec Posting Date  A   
ARRECDATE  273  Date  Last A/R Receipt Posting Date  A   
APPAYDATE  274  Date  Last A/P Payment Posting Date  A   
TIMEDATE  275  Date  Last Timecard Posting Date  A   
STKTRDATE  276  Date  Last Material Usage Posting Date  A   
STKRETDATE  277  Date  Last Material Return Posting Date  A   
EQUIPDATE  278  Date  Last Equipment Posting Date  A   
PODATE  279  Date  Last Purchase Order Date  A   
PORECDATE  280  Date  Last P/O Receipt Date  A   
PORETDATE  281  Date  Last P/O Return Date  A   
OEORDDATE  282  Date  Reserved  A   
OEINVDATE  283  Date  Last O/E Invoice Date  A   
PTAXTOTAL  284  BCD*10.3  Project tax total  E A   
TAUTH1  285  String*12  Tax Authority 1  A X  Mask: %-12N
TAUTH2  286  String*12  Tax Authority 2  A X  Mask: %-12N
TAUTH3  287  String*12  Tax Authority 3  A X  Mask: %-12N
TAUTH4  288  String*12  Tax Authority 4  A X  Mask: %-12N
TAUTH5  289  String*12  Tax Authority 5  A X  Mask: %-12N
TCLASS1  290  Integer  Tax Class 1  A X   
TCLASS2  291  Integer  Tax Class 2  A X   
TCLASS3  292  Integer  Tax Class 3  A X   
TCLASS4  293  Integer  Tax Class 4  A X   
TCLASS5  294  Integer  Tax Class 5  A X   
TINCLUDED1  295  Boolean  Tax Included 1  A X   
TINCLUDED2  296  Boolean  Tax Included 2  A X   
TINCLUDED3  297  Boolean  Tax Included 3  A X   
TINCLUDED4  298  Boolean  Tax Included 4  A X   
TINCLUDED5  299  Boolean  Tax Included 5  A X   
TAXBASES1  300  BCD*10.3  Tax Base 1  E A   
TAXBASES2  301  BCD*10.3  Tax Base 2  E A   
TAXBASES3  302  BCD*10.3  Tax Base 3  E A   
TAXBASES4  303  BCD*10.3  Tax Base 4  E A   
TAXBASES5  304  BCD*10.3  Tax Base 5  E A   
TAXBASEH1  305  BCD*10.3  Tax Base 1  E A   
TAXBASEH2  306  BCD*10.3  Tax Base 2  E A   
TAXBASEH3  307  BCD*10.3  Tax Base 3  E A   
TAXBASEH4  308  BCD*10.3  Tax Base 4  E A   
TAXBASEH5  309  BCD*10.3  Tax Base 5  E A   
TAXAMTS1  310  BCD*10.3  Tax Amount 1  E A   
TAXAMTS2  311  BCD*10.3  Tax Amount 2  E A   
TAXAMTS3  312  BCD*10.3  Tax Amount 3  E A   
TAXAMTS4  313  BCD*10.3  Tax Amount 4  E A   
TAXAMTS5  314  BCD*10.3  Tax Amount 5  E A   
TAXAMTH1  315  BCD*10.3  Tax Amount 1  E A   
TAXAMTH2  316  BCD*10.3  Tax Amount 2  E A   
TAXAMTH3  317  BCD*10.3  Tax Amount 3  E A   
TAXAMTH4  318  BCD*10.3  Tax Amount 4  E A   
TAXAMTH5  319  BCD*10.3  Tax Amount 5  E A   
ONBW  320  Boolean  On Billing Worksheet  E A   
OPENED  321  Boolean  Project Has Been Opened  E A  List: 2 entries
0=No
1=Yes
BILLAMT  322  BCD*10.3  Expected Billings  A   
ORATEOP  323  Integer  Rate Operator  E A  List: 2 entries
1=Multiply
2=Divide
LSTRRPER  324  BCD*5.5  Last Rev. Recognition Percentage  A   
PRFTLOSSSR  325  BCD*10.3  Recognized Profit / Loss  E A   
PRFTLOSSHM  326  BCD*10.3  Recognized Profit / Loss  E A   
REVESTDATE  327  Date  Last Revised Posting Date  A   
ONRW  328  Boolean  On RR Worksheet  E A   
OLABEMHM  329  BCD*10.3  Original Employee Labor  A   
CLABEMHM  330  BCD*10.3  Current Employee Labor  A   
ALABEMHM  331  BCD*10.3  Actual Employee Labor  A   
OOHEMHM  332  BCD*10.3  Original Employee Overhead  A   
COHEMHM  333  BCD*10.3  Current Employee Overhead  A   
AOHEMHM  334  BCD*10.3  Actual Employee Overhead  A   
OOHEQHM  335  BCD*10.3  Original Equipment Overhead  A   
COHEQHM  336  BCD*10.3  Current Equipment Overhead  A   
AOHEQHM  337  BCD*10.3  Actual Equipment Overhead  A   
OOHSUHM  338  BCD*10.3  Original Subcontractor Overhead  A   
COHSUHM  339  BCD*10.3  Current Subcontractor Overhead  A   
AOHSUHM  340  BCD*10.3  Actual Subcontractor Overhead  A   
OOHOHHM  341  BCD*10.3  Original Overhead Overhead  A   
COHOHHM  342  BCD*10.3  Current Overhead Overhead  A   
AOHOHHM  343  BCD*10.3  Actual Overhead Overhead  A   
OOHMIHM  344  BCD*10.3  Original Miscellaneous Overhead  A   
COHMIHM  345  BCD*10.3  Current Miscellaneous Overhead  A   
AOHMIHM  346  BCD*10.3  Actual Miscellaneous Overhead  A   
OOHMAHM  347  BCD*10.3  Original Material Overhead  A   
COHMAHM  348  BCD*10.3  Current Material Overhead  A   
AOHMAHM  349  BCD*10.3  Actual Material Overhead  A   
CDATEFROM  350  Date  Current Start Date  A X   
PROJSTYLE  351  Integer  Project Style  E A X  List: 2 entries
1=Standard
2=Basic
APTAXEXPHM  352  BCD*10.3  Reserved  A   
APTAXRECHM  353  BCD*10.3  Reserved  A   
APTAXEXCHM  354  BCD*10.3  Reserved  A   
APDISCHM  355  BCD*10.3  Reserved  A   
APINTHM  356  BCD*10.3  Reserved  A   
ARTAXHM  357  BCD*10.3  Reserved  A   
ARTAXSR  358  BCD*10.3  Reserved  A   
ARDISCHM  359  BCD*10.3  Reserved  A   
ARDISCSR  360  BCD*10.3  Reserved  A   
ARINTHM  361  BCD*10.3  Reserved  A   
ARINTSR  362  BCD*10.3  Reserved  A   
ARWRITEHM  363  BCD*10.3  Reserved  A   
ARWRITESR  364  BCD*10.3  Reserved  A   
PLCODE  365  String*16  Reserved  A   
BILLAMTC  366  BCD*10.3  Current Billings (AR and on BW)  A   
POCOSTHM  367  BCD*10.3  Committed P/O Cost  A C   
POOHHM  368  BCD*10.3  Committed P/O Overhead  A C   
POLABORHM  369  BCD*10.3  Committed P/O Labor  A C   
POTCOSTHM  370  BCD*10.3  Committed P/O Total Cost  A C   
POEMQTY  371  BCD*10.5  P/O Employee Quantity  A   
POEMOHHM  372  BCD*10.3  P/O Employee Overhead  A   
POEMLABHM  373  BCD*10.3  P/O Employee Labor  A   
POEMTCOSTH  374  BCD*10.3  P/O Employee Total Cost  A   
POEQQTY  375  BCD*10.5  P/O Equipment Quantity  A   
POEQOHHM  376  BCD*10.3  P/O Equipment Overhead  A   
POEQTCOSTH  377  BCD*10.3  P/O Equipment Total Cost  A   
POSUQTY  378  BCD*10.5  P/O Subcontractor Quantity  A   
POSUOHHM  379  BCD*10.3  P/O Subcontractor Overhead  A   
POSUTCOSTH  380  BCD*10.3  P/O Subcontractor Total Cost  A   
POOHQTY  381  BCD*10.5  P/O Overhead Quantity  A   
POOHOHHM  382  BCD*10.3  P/O Overhead Overhead  A   
POOHTCOSTH  383  BCD*10.3  P/O Overhead Total Cost  A   
POMIQTY  384  BCD*10.5  P/O Miscellaneous Quantity  A   
POMIOHHM  385  BCD*10.3  P/O Miscellaneous Overhead  A   
POMITCOSTH  386  BCD*10.3  P/O Miscellaneous Total Cost  A   
POMAQTY  387  BCD*10.5  P/O Material Quantity  A   
POMAOHHM  388  BCD*10.3  P/O Material Overhead  A   
POMATCOSTH  389  BCD*10.3  P/O Material Total Cost  A   
VALUES  390  Long  Optional Fields  E A C   
CLEARED  391  Integer  Transactions have been cleared  E A  List: 2 entries
0=No
1=Yes
CODETAXGRP  392  String*12  Tax Group  E A  Mask: %-12N
CTCLASS1  393  Integer  Customer Tax Class 1  E A   
CTCLASS2  394  Integer  Customer Tax Class 2  E A   
CTCLASS3  395  Integer  Customer Tax Class 3  E A   
CTCLASS4  396  Integer  Customer Tax Class 4  E A   
CTCLASS5  397  Integer  Customer Tax Class 5  E A   
CTAUTH1  398  String*12  Customer Tax Authority 1  E A   
CTAUTH2  399  String*12  Customer Tax Authority 2  E A   
CTAUTH3  400  String*12  Customer Tax Authority 3  E A   
CTAUTH4  401  String*12  Customer Tax Authority 4  E A   
CTAUTH5  402  String*12  Customer Tax Authority 5  E A   
LUPDATE  403  Date  Last US Payroll Posting Date  A   
LCPDATE  404  Date  Last Canadian Payroll Posting Date  A   
STRDCOSTHM  405  BCD*10.3  Stored Cost  A   
STRDBILLSR  406  BCD*10.3  Stored Billable Amount  A   
PRECOLEDSR  407  BCD*10.3  Previous D + E  A   
STRDOHHM  408  BCD*10.3  Overhead Amount  A   
STRDTCSTHM  409  BCD*10.3  Total Stored Cost  A   
TXEXPCOMHM  410  BCD*10.3  Tax (exp) Committed (func)  A   
TXALLCOMHM  411  BCD*10.3  Tax (all) Committed (func)  A   
STRDQTY  412  BCD*10.5  Stored Quantity  A   
PREAIAPAY  413  BCD*10.3  Previous Certificates for Payment  A   
PRESTORED  414  BCD*10.3  G703 Column F from Last AIA Report  A   
PRERETAIN  415  BCD*10.3  G703 Column I from Last AIA Report  A   
IDACCTSET  417  String*6  Account Set  E A  Mask: %-6N
CUSTCCY  418  String*3  Customer Currency  E A   
CUSCONTACT  419  String*60  Contact  E A   
CTACTITTLE  420  String*60  Position  E A   
CTACPHONE  421  String*30  Phone  E A  Mask: %-30c
OTHERPHONE  422  String*30  Other Phone  E A  Mask: %-30c
CTACFAX  423  String*30  Fax  E A  Mask: %-30c
CTACEMAIL  424  String*60  E-mail  E A   
MULTICUST  425  Integer  Invoice to Multiple Customers  E A X  List: 2 entries
1=Yes
0=No
BILLED  426  Integer  Has this Project been billed?  E A   
OESHPDATE  427  Date  Last O/E Shipment Date  A   
PRICEOPT  428  Integer  Default Billing Rate  E A X  List: 3 entries
1=Billing Rate
2=Use Customer Price List
3=Use Specified Price List
PRICELIST  429  String*6  Price List  A X  Mask: %-6N
OEMCHGOPT  430  Integer  O/E Miscellaneous Charges  E A X  List: 2 entries
0=Default Cost from Contract
1=Default Cost from Misc. Charges
ARACCTSET  431  String*6  A/R Account Set  E A X  Mask: %-6N
UPCP  1001  Integer  Update Category Cost Plus % rt  E A C   
FUNCTION  1002  Integer  Function rt  E A C  List: 4 entries
0=None
2=Can insert categories?
3=Reload Blank Accounts
10=Load Optional Fields
RATEERR  1003  Integer  Rate Error Code rt  E A C  List: 5 entries
0=No rate error
1=Rate type is invalid
2=Rate is zero
3=Rate is outside spread
4=No rate information exists
BILLDESC  1004  String*60  Billing Account Description rt  A C   
REVDESC  1005  String*60  Revenue Account Description rt  A C   
WIPDESC  1006  String*60  WIP Account Description rt  A C   
COGSDESC  1007  String*60  COGS Account Description rt  A C   
RCOSTPLUSP  1008  BCD*5.5  Cost Plus % at Read rt  A C   
ORJQTY  1010  BCD*10.5  Quantity rt  A C   
CURQTY  1011  BCD*10.5  Current Quantity Estimate rt  A C   
ACTQTY  1012  BCD*10.5  Actual Quantity rt  A C   
ORJCOSTHM  1013  BCD*10.3  Extended Cost rt  A C   
CURCOSTHM  1014  BCD*10.3  Current Cost Estimate rt  A C   
ACTCOSTHM  1015  BCD*10.3  Actual Cost rt  A C   
SNAPCALC  1016  Integer  Extended Cost rt  E A   
SNAPOFROM  1017  Date  Extended Cost rt  E A X   
SNAPOTO  1018  Date  Extended Cost rt  E A X   
SNAPCFROM  1019  Date  Extended Cost rt  A X   
SNAPCTO  1020  Date  Extended Cost rt  A X   
HASOPT  1021  Boolean  Optional Fields rt  E A C  List: 2 entries
1=Yes
0=No
OPENING  1022  Integer  Optional Fields rt  E A C  List: 3 entries
0=Not opening
1=Contract opening
2=Project opening
UPDATE  1023  Integer  Optional Fields rt  E A C   
CUSTNAME  1024  String*60  Customer Name rt  A C   

This page was generated on 2009-Nov-19